The current climate highlights the importance of secure remote access and monitoring of systems. Please contact us to discuss our bespoke solution.
The complete refurbishment of 61 Southwark Street London SE1, CAT A refurbishment over 9 floors.
Controlled Ltd was commissioned for the Design, Installation and commissioning of an addressable Fire alarm system to include very early smoke detection analysis, Network access control, intercom and a network CCTV system, project duration 18 months.